How to Install a Fifth String Shubb Banjo Capo
ID: 37665
Description: Use basic skills and handy work to install a...
Steps:
- Line the capo up along the fifth string side of the fretboard as shown.
- Line the capo screw holes up about 12 mm from the fifth fret bar and about 4 mm from the face of the fret.
- Be careful not to line the capo screw holes up directly below a fret bar or directly on top of a fret marker.
- Use the marker to mark where the screws should go.
- Use the drill to drill both holes for the two screws.
- The holes should be drilled about 1 cm deep
- You may need to borrow an extra pair of hands to help you stabilize the banjo while you perform this step.
- Use the flat head screw driver to insert and tighten the screws.
- To use the capo, slide the capo finger down to the desired fret.
- Then, tighten the spring knob.